Drawing from the stone and gravel stockpile area (arable field) for riffle work [05/10]
Stone brought up for riffle 3 (around islands) [05/10]
Stone and gravel in cattle crossing 1; continued downstream to make riffle 1
[06/10]
Stone being brought up for cattle crossing 1 [06/10]
Stone and gravel having been put on place from bank to river by digger to create riffle 2; note deep "trout run" on west bank. [06/10.]
Riffle 5 in place; with LWD 5 set on top
[16/10]
Cattle crossing 1/riffle 1; looking downstream after heavy rain event
[23/10]
Installing cattle crossing 1
[06/10]