Temporary bridge across side channel, installed 11/10 after a shower of rain [16/10]
Spoil was deposited on arable field. Large stone was removed by hand either at meadow or field end
[16/10]
Spread soil ploughed in
[07/12]
Spoil spread over part of the arable field [21/10]
Final stages of re-instating side channel approaches; recovered large flint was used in cattle crossing 3
[07/12]
Small stone recovered was used to re-instate stream bed at the crossing, and extend upstream and (shown) downstream