Staking and fencing wire support for LWD
[06/10]
Staking LWD 2
[05/10]
LWD 1, at head of riffle 2. Set into bank by digger, braced by posts and wiring
[16/10]
LWD 5 on riffle 5, showing flow deflection [16/10]
LWD 5 following overnight heavy rain [23/10]
LWD 5 on riffle 5, showing flow over riffle
[16/10]
LWD 5 and downstream flow impact
[07/12]