Sun on upper reach of river, after sycamore removal. [07/09]
Spoil bank on meadow and river bank, upper middle reach [07/09]
Route for taking spoil off the meadows, crossing the side channel. [07/09]
Spoil on river bank, viewed from in-stream. [07/09]
Upstream from Letheringsett ford. Site for riffle 1, from cattle crossing 1. [04/10]
River at confluence with side channel. Site for mid-stream islands and riffle 3. [07/09]
Cattle crossing 1 after removal of alder saplings. [07/09]
Water vole survey; recording and flagging of burrow and latrine positions [done late June]
Hazel cut and bundled as faggots for river narrowing work [September and October]
Felled sycamores for LWD work. [07/09]