Spoil removal by tracked digger and 2 dumpers working in tandem [11/10]
Re-profiling the river bank (the shovel is to clean the digger bucket!) [11/10]
Protection of the re-profiled bank against erosion in flood until vegetation is re-established (technique as for river narrowing) [16/10]
Bank protection around the old alder, tree 1 [21/10]
Digger working on final (downstream) stretch of spoil removal [16/10]
View 6 weeks after work completion. Shows the shape of the river revealed, the area of spoil coverage, and bank protection [07/12]
Bank protection, upstream section [25/10]
Close up of bank protection, which was finished with the coir matting to prevent soil loss in flood and will allow vegetation to grow through. Also shows LWD 9 and cattle crossing 3; latter done by hand with recovered stone and "gleaned" gravel [07/12]